style 206
- March 27, 2020
Facility Issue:
In a brine concentrator, an original competitor’s expansion joint failed upon start up.
Industry:
Water Treatment
Background of the Facility:
This facility is a Zero Liquid Discharge (ZLD) power plant. Water is initially pumped from a well, pre-treated, used as process water, then reclaimed and retreated with a Brine Concentrator for use in their cooling towers. No city water is used and no waste water is disposed of from the site.
