hydroelectric
- June 07, 2018
The sluice gate at Faraday Dam in Oregon operates fully submerged with approximately 40′ of head at the middle of the gate. The estimated operation pressure on each of the bushings is around 4,000psi (4ksi). The gate is used for water level control, therefore continuously makes small adjustments to its elevation.
The gate was removed in September 2014 to perform inspection of gate wheel assembly and bearings. It was determined that several of the wheels had either stopped working or fallen off due to corrosion and lack of lubrication. The remaining bearings were found to have excessive clearance due to wear. New stainless steel sleeves were fabricated by Portland Manufacturing and welded onto the gate wheel stub shafts. New composite greaseless bushings supplied by CIP were installed to replace the failed bearings.
- April 26, 2018
Hydropower has been used for thousands of years and represents the largest, most efficient and proven renewable energy source on the planet. The rehabilitation and repowering of existing generation stations, as well as developing generation at non powered dams, and introducing pump storage strategies provide a multitude of opportunities for continued growth within the industry. Water management in much of the world is faced with changing regulations to support the balancing act between power generation, ecological sustainability, and agriculture irrigation. New technologies, equipment, and modern controls systems to optimize production are aiding the industry in this balance while continuing to increase power generation.
Suppliers, like Columbia Industrial Products, must be equipped to provide quality assurance, formal documentation, and products that will perform for decades in mixed use environments. CIP has built a solid reputation while working with the US Army Corps of Engineers, Utilities, and Contractors fulfilling these requirements while providing a high quality bearing product.
CIP Composites is the leading manufacturer of environmentally friendly, self-lubricating bearings and wear pads designed to replace greased bronze components inside a variety of turbine designs, gates and valves, and auxiliary equipment. CIP composite products provide the perfect balance of performance, availability, and cost to satisfy the most rigorous demands of your hydro generation project, no matter the schedule or scale.
- June 08, 2017
As the largest gathering of hydro professionals worldwide, join 3000+ attendees and 320+ exhibiting companies from around the world for a week of informative hydropower-focused meetings, workshops, tours, an extensive program and exhibition. HydroVision International highlights perspectives on the role of hydropower, explores issues affecting hydro resources, and helps participants develop a vision to meet challenges and ensure the future sustainability of hydro.
Benefits of Attending:
- Build alliances among 3,000+ hydro professionals and water resource stakeholders
- Attend multiple networking events to make a connection with colleagues
- Share knowledge, expertise and viewpoints toward effective solutions
- Gain a better understanding of current and future challenges affecting hydro during the 60+ conference sessions
- Hear from over 400 hydro speakers
- See the most comprehensive collection of 320+ hydro-related product and service providers on the exhibit floor
- Promote technology development to sustain the hydro industry
- Earn Professional Development Hour Credits - Attendees registered as Full Conference Delegates are eligible to receive 15 Professional Development Hours (PDH) credits.
- September 13, 2016
Hydroelectric power, generated mainly by hydroelectric dams or run-of-river sites, is a clean, non-emitting, renewable source of energy. It provides low-cost electricity with virtually zero carbon emissions.
Garlock has more than 100 years of experience in the fluid sealing industry and provides many product lines well-suited for hydroelectric plants. Couple that with Gallagher Fluid Seals' vast experience in the hydroelectric industry and you'll come away with a team that is uniquely qualified to supply all your hydroelectric plant needs.
Read on to learn more from Garlock's hydroelectric plant product recommendation guide.